Demolition of the Houston Ship Channel Bridge

AR2V performed the design and drawings of the proposed alternatives for the existing main bridge demolition, as well as the analysis and design of other required structures: cofferdams, trestles... We analyzed the structural safety of the different demolition alternatives and the design and drawings of three trestle facilities needed for the loading and unloading of the segments to and from the barges.

 

To link

Página web oficial sobre el proyecto

Data table

  • Client: FLATIRON-PULICE-DRAGADOS USA
  • Location: HOUSTON (TX)
  • Year: 2017
  • Typology: footbridge